Sl. No.
Name of Work Client Status                   Silent Features
1  GIR (Geo Tech Investigation Reports) review for structures and embankment for Western Dedicated Freight Corridor- CTP14 Project  

M/s SLT Consortium (Sojitz and L&T Construction)

On going ·         GIR review for Embankment’s  (128km)

·         GIR review for Minor bridges   (250 Nos)

·         GIR review for Major bridges   (70Nos)

 

2 Dedicated Freight Corridor Project (Package CTP-12) – Engagement of outside Consultant for review of Alignment Design/Drawings. ORIENTAL CONSULTANTS GLOBAL CONSORTIUM

OCG – OCI – NK – NKI-RITES

On going ·         Review of Alignment Design / Drawings for total length of 186 Km for Package CTP-12
3 Dedicated Freight Corridor Project (Package CTP-13) – Engagement of outside Consultant for review of Alignment Design/Drawings. ORIENTAL CONSULTANTS GLOBAL CONSORTIUM

OCG – OCI – NK – NKI-RITES

On going ·         Review  of Alignment Design /Drawings for total length of 134 Km for Package CTP-13
4 Dedicated Freight Corridor Project (Package CTP-15A, 15B and 15 C) – Engagement of outside Consultant for review of Alignment Design/Drawings. ORIENTAL CONSULTANTS GLOBAL CONSORTIUM

OCG – OCI – NK – NKI-RITES

On going ·         Review  of Alignment Design /Drawings for total 12 Nos of Bridges.
5 Providing Services for Topographical Survey for “International Architecture Design Competition tor the Comprehensive Architecture cum Design Consultancy Services for the proposed construction of 1. Interchange Metro Station at Sitaburdi including Property Development above the station and on TTMC area with connectivity to Munje Chowk and 2. Zero Mile Metro Station including property development above the station and on adjoining land area”. ENIA ARCHITECTS Completed Confirmatory Topographical Survey of along the Alignment and at proposed locations of Metro station.
6 Rail track Design CTP 1 & 2

Review/Modification of DN line alignment

Design of UP Main line

Preparation of Rail Elevation Table for main line, loop line & connecting line in XML file

Earthwork Cross Section of yards

L&T, Faridabad, Delhi Completed Review/Modification of DN line alignment

Design of UP Main line

Preparation of Rail Elevation Table for main line, loop line & connecting line in XML file

Earthwork Cross Section of yards

7 Hydrology calculations at major/Important (80 nos.) bridges of Package CT P-3 (R) of Dedicated Freight Corridor Project (Western Corridor Phase-1) for Pre-Bid Services L&T, Faridabad, Delhi completed Project Cost :  INR 4700cr.

Detailed Scope of Work

·         Calculation Design Flood Discharge

·         Required Min. Vertical Clearance

Design of scour data for Piers and abutments

8 Preparation of the Plan & Profile drawings and earthwork cross sections for Sabarmati & Mahi River as per the Dedicated Freight Corridor Company India Limited (DFCCIL) codal provisions for Package CTP3AR. Gammon India Ltd completed Project Cost :  INR 329cr.

Detailed Scope of Work

·         Preparation of Plan and Profile for both rivers

·         Earth work Calculations

·         Horizontal and Vertical Alignment design

·         Cross section development at 20mtr interval

Longitudinal section development

9 Rail track Formation work for 626 km Dedicated Freight Corridor Project (Western Corridor Phase-1) –Rewari –Iqbalgarh CTP-1&2 L&T, Faridabad, Delhi completed Project Cost :  INR 6700cr.

Detailed Scope of Work

·         Review of down track -horizontal and vertical alignment

·         Design of Cant alignment for UP and DN track

·         Design of up uptrack – horizontal and vertical alignment

·         Data extraction and preparation and submission of reports.

10 Alignment Design, earthwork cross sections and earthwork quantity calculations for Pre-Bid of Package CTP 3 R (approx. 340 Km) for Dedicated Freight Corridor Project (Western Corridor Phase-1) Triplex Builders completed Project Cost :  INR 4700cr.

Detailed Scope of Work

·         Vertical and Horizontal Alignment Design

·         Calculation of earthwork quantities in embankment/ cutting etc.

·         Preparation of Cross sections @20mtr interval

·         Calculations for Retaining Walls e.g. Length, RCC, etc.

11 Construction of Foot Over Bridge with staircase and lift for pedestrian at Ullan Battar Marg, New Delhi.  SH : Detailed design, drawing and soil testing of Foot Over Bridges PWD /GNCTD completed Project Cost :  INR 3cr.

Detailed Scope of Work

·         Geotechnical Testing

·         Detailed design of Architectural and structural Design.

12 A/R and M/O Roads under PWD Divn. M-113, New Delhi during 2013-2014 Sh : Topographical Survey of Proposed Roads under Sub division M-1132 PWD, GNCTD. completed Project Cost :  INR 3cr.

Detailed Scope of Work

·         Topographical Survey of Ullan batar Marg, Rao Tula Ram Marg Road, Affrica Avenue Road.

·         Proposal for road widening of Rao Tula Road for Decongestion of Traffic.

·         Feasibility study for Proposal of FOB at said locations.

·         Presentation at Secretary, Delhi Govt., GNCTD.

·         Tree cutting demarcation etc.

13 Detail Design of Pile Foundation for 30mtr. High Communication Tower at Sikender pur Metro Station of RMGL The Fibcom India Ltd. completed Detailed Scope of Work

This design contains the foundation design of 30m high communication tower situated at sikinderpur station. The location of tower is just adjacent to the diaphragm wall of future subway.

14 Preparation and submission of as Built Drawing (Architectural) of Six (6) Elevated Metro Station of Rapid Metro Rail Gurgaon. IL&FS Rail Limited completed Project Cost :  INR 250cr.

Detailed Scope of Work

·         Preparation of As built Drawings from site measurement as per requirement of SOD of Rapid Metro Rail Gurgaon Ltd., (RMGL) Gurgaon, Haryana.